Subscribe

By the Numbers

Contract Value

$6.4

Billion (CDN)

Design-Build Period

October 5, 2018

Official start

Operation Period

30

Years

Jobs

2500

Created

Bridge

The Bridge - English (2023-06-26)
Width of bridge and multi use path
Traffic Lanes

6

3 CDN Bound | 3 US Bound

1

Multi-Use Path

The Gordie Howe International Bridge ranges from white to dark grey in colour

High-powered LED lighting illuminate the bridge

The bridge tower shape reflects the curvature of a hockey stick in a slap shot

The multi-use path has a green surface that is skid resistant and
retro-reflective

Canadian Port of Entry

53 hectares/
130 acres

Total Area of Port

12,438m²/
133,881ft²

Total Building Space

10 hectares/
24 acres

Total Landscaped Area

A First Nation art piece is featured at the Port of Entry

Black Oak Savannah & Tallgrass Prairie
landscapes are featured

24

Primary Inspection Lanes

16

Toll Lanes

US Port of Entry

68 hectares/
167 acres

Total Area of Port

30,318m²/
326,335ft²

Total Building Space

12 hectares/
30 acres

Total Landscaped Area

A 100ft buffer with vegetation and a public path surround the Port of Entry

36

Primary Inspection Lanes

Michigan Interchange

Part 4 Michigan Interchange
Continue to the Next Page: